This Is What I Think.

Monday, September 24, 2007

USS George Washington (SSBN 598)

From 6/7/1976 to 10/18/1980 (CGN 41) is 133 days, 4 years

1-334

http://www.nvr.navy.mil/nvrships/details/CGN41.htm

ARKANSAS (CGN 41)
GUIDED MISSILE CRUISER (NUCLEAR-PROPULSION)

Commission Date: 10/18/1980
Decommission Date: 07/07/1998





From 5/1/1967 to 7/7/1998 (CGN 41) is: 11390 days
11390 * 0.333 = 3792 days
From 3/3/1959 to 7/20/1969 (Apollo 11 lunar landing) is: 3792 days

3-3-3





From 11/2/1975 to 8/5/1978 (CGN 40) is 33 months, 3 days

3-3-3

http://www.nvr.navy.mil/nvrships/details/CGN40.htm

MISSISSIPPI (CGN 40)
GUIDED MISSILE CRUISER (NUCLEAR-PROPULSION)

Commission Date: 08/05/1978
Decommission Date: 07/28/1997





From 5/1/1967 to 7/28/1997 (CGN 40) is: 11046 days
11046 * 0.3433 = 3792 days
From 3/3/1959 to 7/20/1969 (Apollo 11 lunar landing) is: 3792 days

3-3-3





From 3/3/1959 to 9/11/1976 (CGN 38) is: 6402 days
6402 * 0.593 = 3796
From 3/3/1959 to 7/24/1969 (Apollo 11 splashdown) is: 3796 days

59-3

http://www.nvr.navy.mil/nvrships/details/CGN38.htm

VIRGINIA (CGN 38)
GUIDED MISSILE CRUISER (NUCLEAR-PROPULSION)

Commission Date: 09/11/1976
Decommission Date: 11/10/1994





From 11/11/1966 (Gemini 12 launch) to 11/10/1994 (CGN 38) is: 10226 days
10226 * 0.3433 = 3510 days
From 3/3/1959 to 10/11/1968 (Apollo 7) is: 3510 days

34-33





From 9/2/1965 (Princeton) to 3/28/1991 (DDG 41) is: 1334 weeks

1-334

http://www.nvr.navy.mil/nvrships/details/DDG41.htm

KING (DDG 41)
GUIDED MISSILE DESTROYER

Decommission Date: 03/28/1991





The Ticonderoga commissioned on a Saturday and the following day was precisely 5 years, 9.3 months after 4/14/1977.

From 4/14/1977 to 1/23/1983 (Sunday) is 5 years, 9 months, 9 days
9 / 30 = 0.3 month
From 4/14/1977 to 1/23/1983 (Sunday) is 5 years, 9.3 months

59-3

http://www.navysite.de/cg/cg47.html

USS Ticonderoga (CG 47)

USS TICONDEROGA was the lead ship of the TICONDEROGA class

Commissioned: January 22, 1983
Decommissioned: September 30, 2004


http://www.nvr.navy.mil/nvrships/details/CG47.htm

TICONDEROGA (CG 47)
GUIDED MISSILE CRUISER

Commission Date: 01/22/1983
Decommission Date: 09/30/2004





From 3/3/1959 to 1/25/1975 (CGN 37) is: 5807 days
From 7/16/1963 to 12/19/1972 (Apollo 17 splashdown) is: 3444 days
3444 / 5807 = 0.593

59-3

http://www.nvr.navy.mil/nvrships/details/CGN37.htm

SOUTH CAROLINA (CGN 37)
GUIDED MISSILE CRUISER (NUCLEAR-PROPULSION)

Commission Date: 01/25/1975
Decommission Date: 07/30/1999








http://www.navysite.de/ssbn/index.html

Fleet Ballistic Missile Submarines - SSBN

Fleet ballistic missile submarines are designed to carry and launch long-range strategic missiles. These are the biggest submarines in the Navy.





From 11/26/1976 to 1/24/1985 (SSBN 598) is: 2981 days
From 3/3/1959 to 5/1/1967 is: 2981 days

http://www.navysite.de/ssbn/ssbn598.htm

USS George Washington (SSBN 598)

USS GEORGE WASHINGTON was the Navy's first nuclear-powered fleet ballistic missile submarine.

Decommissioned: January 24, 1985


http://www.nvr.navy.mil/nvrships/details/SSN598.htm

GEORGE WASHINGTON (SSN 598)
(ex-SSBN 598)
SUBMARINE (NUCLEAR-POWERED)

Decommission Date: 01/24/1985





From 6/19/1968 to 5/25/1984 is 15 years, 341 days
341 / 365 = 0.934 year
From 6/19/1968 to 5/25/1984 is 15.934 years

1-59-34

http://www.navysite.de/ssbn/ssbn599.htm

USS Patrick Henry (SSBN 599)

USS PATRICK HENRY was the Navy's second nuclear-powered fleet ballistic missile submarine and the second ship in the GEORGE WASHINGTON - class.

Decommissioned: May 25, 1984


http://www.nvr.navy.mil/nvrships/details/SSN599.htm

PATRICK HENRY (SSN 599)
(ex-SSGN 599, SSBN 599)
SUBMARINE (NUCLEAR-POWERED)

Decommission Date: 05/25/1984





From 5/1/1967 to 2/28/1981 is 13 years, 43 weeks, 3 days

(Day,Week,Month,Year)

1-34-33

http://www.nvr.navy.mil/nvrships/details/SSBN600.htm

THEODORE ROOSEVELT (SSBN 600)
(ex-SSGN 600)
BALLISTIC MISSILE SUBMARINE (NUCLEAR-POWERED)
Decommission Date: 02/28/1981





From 7/16/1969 (Apollo 11 launch) to 12/1/1983 is 14 years, 4 months, 15 days

'1-4415'

From 3/4/1959 to 7/16/1963 is 4 years, 4 months, 1 week, 5 days

'4415'

http://www.navysite.de/ssbn/ssbn601.htm

USS Robert E. Lee (SSBN 601)

USS ROBERT E. LEE was the fourth GEORGE WASHINGTON - class nuclear-powered fleet ballistic missile submarine

Decommissioned: December 1, 1983


http://www.nvr.navy.mil/nvrships/details/SSN601.htm

ROBERT E. LEE (SSN 601)
(ex-SSBN 601)
SUBMARINE (NUCLEAR-POWERED)

Decommission Date: 12/01/1983





From 5/1/1967 to 2/28/1981 is 13 years, 43 weeks, 3 days

(Day,Week,Month,Year)

1-34-33

http://www.nvr.navy.mil/nvrships/details/SSBN602.htm

ABRAHAM LINCOLN (SSBN 602)
BALLISTIC MISSILE SUBMARINE (NUCLEAR-POWERED)
Decommissioned: February 28, 1981





From 6/7/1976 to 3/31/1983 is: 2488 days

2488 / 2 = 1244

'1244'

From 3/4/1959 to 7/16/1963 is 12 days, 4 months, 4 years

'1244'

http://www.navysite.de/ssbn/ssbn608.htm

USS Ethan Allen (SSBN 608)

USS ETHAN ALLEN was the first ship of the Navy's second generation of nuclear powered fleet ballistic missile submarines

Decommissioned: March 31, 1983


http://www.nvr.navy.mil/nvrships/details/SSN608.htm

ETHAN ALLEN (SSN 608)
(ex-SSBN 608)
SUBMARINE (NUCLEAR-POWERED)

Decommission Date: 03/31/1983





From 7/2/1976 to 9/6/1991 is 15 years, 9 weeks, 3 days

1-59-3

http://www.navysite.de/ssbn/ssbn609.htm

USS Sam Houston (SSBN 609)

USS SAM HOUSTON was the second ETHAN ALLEN - class nuclear powered fleet ballistic missile submarine

Decommissioned: September 6, 1991


http://www.nvr.navy.mil/nvrships/details/SSN609.htm

SAM HOUSTON (SSN 609)
(ex-SSBN 609)
SUBMARINE (NUCLEAR-POWERED)

Decommission Date: 09/06/1991





From 7/16/1969 (Apollo 11 launch) to 12/1/1983 is 14 years, 4 months, 15 days

'1-4415'

From 3/4/1959 to 7/16/1963 is 4 years, 4 months, 1 week, 5 days

'4415'

http://www.navysite.de/ssbn/ssbn610.htm

USS Thomas A. Edison (SSBN 610)

USS THOMAS A. EDISON was the third ETHAN ALLEN - class nuclear powered fleet ballistic missile submarine

Decommissioned: December 1, 1983


http://www.nvr.navy.mil/nvrships/details/SSN610.htm

THOMAS A. EDISON (SSN 610)
(ex-SSBN 610)
SUBMARINE (NUCLEAR-POWERED)

Decommission Date: 12/01/1983





From 3/4/1959 to 7/22/1992 is 33 years, 4 months, 18 days
30 * 0.59 = 17.7 days
From 3/4/1959 to 7/22/1992 is 33 years, 4.59 months

334-59

http://www.navysite.de/ssbn/ssbn611.htm

USS John Marshall (SSBN 611)

USS JOHN MARSHALL was the fourth ETHAN ALLEN - class nuclear powered fleet ballistic missile submarine.

Decommissioned: July 22, 1992


http://www.nvr.navy.mil/nvrships/details/SSN611.htm

JOHN MARSHALL (SSN 611)
(ex-SSBN 611)
SUBMARINE (NUCLEAR-POWERED)

Decommission Date: 07/22/1992





From 11/26/1976 to 1/24/1985 (SSBN 618) is: 2981 days
From 3/3/1959 to 5/1/1967 is: 2981 days

http://www.navysite.de/ssbn/ssbn618.htm

USS Thomas Jefferson (SSBN 618)

USS THOMAS JEFFERSON was the fifth and final ETHAN ALLEN - class nuclear powered fleet ballistic missile submarine

Decommissioned: January 24, 1985





From 11/2/1975 to 8/12/1991 is: 15 years, 9 months, 10 days
10 / 30 = 0.33
From 11/2/1975 to 8/12/1991 is: 15 years, 9.33 months

1-59-33

http://www.navysite.de/ssbn/ssbn616.htm

USS Lafayette (SSBN 616)
USS LAFAYETTE was the lead ship of the Navy's LAFAYETTE - class of nuclear fleet ballistic missile submarines and the second ship in the Navy to bear the name.
Decommissioned: August 12, 1991


http://www.nvr.navy.mil/nvrships/details/SSBN616.htm

LAFAYETTE (SSBN 616)
BALLISTIC MISSILE SUBMARINE (NUCLEAR-POWERED)
Decommission Date: 08/12/1991