From 2/14/1986 to 12/9/2001 is: 15 years, 9 months, 3 weeks, 4 days
1-59-34
http://www.imdb.com/title/tt0271454/
The Day Reagan Was Shot (2001) (TV)
Release Date: 9 December 2001 (USA)
Richard Crenna ... Ronald Reagan
From 1/14/1943 to 4/14/1977 is 3 months, 34 years
3-3-4
http://www.imdb.com/name/nm0852466/
Holland Taylor
Date of Birth: 14 January 1943
The Day Reagan Was Shot (2001) (TV) .... Nancy Reagan
From 6/24/1952 to 2/14/1986 is: 33 years, 33 weeks, 4 days
33-34
http://en.wikipedia.org/wiki/Fernando_L._Ribas-Dominicci
Major Fernando Luis Ribas-Dominicci (June 24, 1952 – April 15, 1986), born in Utuado, Puerto Rico, was an F-111F pilot in the United States Air Force. He was killed during Operation El Dorado Canyon, the April 15, 1986 U.S. air raid on Libya.
In 1985, he completed his master's degree in aeronautical science at the Embry-Riddle Aeronautical University in Daytona Beach, Florida, USA.
Operation El Dorado Canyon On April 14, 1986, in response to acts of terrorism thought to be sponsored by Libyan leader Muammar al-Qaddafi — in particular, the Berlin discotheque bombing of April 6 — and against the backdrop of heightened tension and clashes between the Libyan and U.S. navies over Libya's disputed territorial water claims in the Gulf of Sidra, the United States launched a surprise attack on key facilities in Tripoli and other parts of Libya. The attack was code-named Operation El Dorado Canyon.
http://zip4.usps.com/zip4/zcl_1_results.jsp
ZIP Code™ Matches in PRESIDIO, TX
79845
7-9845
From 3/3/1959 to 2/14/1986 is: 9845 days
I recognize the date 2/14/1986 as when I was shot down by anti-aircraft fire and was a Prisoner of War in Libya.
I recognize the date 4/14/1986 as when I escaped into the desert from the Libyans where I was being held as a Prisoner of War. I recognize the date 5/13/1987 as when I completed my escape after running down the African continent to evade capture. The 1988 premiere date of "The Presidio" puts 5/13/1987 as the mid-point with 4/14/1986.
From 4/14/1986 to 5/13/1987 is: 394 days
From 5/13/1987 to 6/10/1988 is: 394 days
http://www.imdb.com/title/tt0095897/
The Presidio (1988)
Release Date: 10 June 1988 (USA)
From 3/4/1959 to 10/11/2004 is: 16658 days
16658 * 0.593 = 9878
From 3/4/1959 to 3/20/1986 is: 9878 days
From 2/14/1986 to 4/14/1986 is: 59 days
59 * 0.593 = 34
From 2/14/1986 to 3/20/1986 is: 34 days
http://en.wikipedia.org/wiki/Astronaut_%28album%29
Astronaut is an album by British band Duran Duran, first released on October 11, 2004
This was Duran Duran's first studio album since Pop Trash (2000), and the first full album since Seven and the Ragged Tiger (1983) to be recorded by the original five members of the band. (The stand-alone single "A View to a Kill" was their last studio recording together.)
From 2/14/1986 to 5/24/1989 is: 3 years, 3 months, 10 days
10 / 30 = 0.333
From 2/14/1986 to 5/24/1989 is: 3 years, 3.3 months
3-3-3
http://en.wikipedia.org/wiki/Indiana_Jones_and_the_Last_Crusade
Release date(s) May 24, 1989
Indiana Jones and the Last Crusade is a 1989 adventure film directed by Steven Spielberg and starring Harrison Ford, Sean Connery, Denholm Elliott, Julian Glover, Alison Doody, River Phoenix, and John Rhys-Davies. This film is the third released, though the twenty-fifth chronologically, in a series of film and TV productions about the adventures of the heroic fictional archaeologist Indiana Jones.
When Dr. Henry Jones Sr. (played by Connery) vanishes while pursuing a life-long search for the Holy Grail, Indiana must retrace his father's steps in the hopes of rescuing him – and the Grail – from the clutches of the Nazi military machine. The film was the highest grossing movie of 1989.
The movie premiered on a Friday and the following Wednesday, 12/5/2001, was 15 years, 9 months, 3 weeks, after 2/14/1986, which is within the day-of-week scheduling constraint.
From 11/30/2001 (Friday) to 12/5/2001 (Wednesday) is: 5 days
From 2/14/1986 to 12/5/2001 (Wednesday) is: 15 years, 9 months, 3 weeks
1-59-3
http://www.imdb.com/title/tt0159273/
Behind Enemy Lines (2001)
Release Date: 30 November 2001 (USA)
Plot Outline: A Navy navigator is shot down over enemy territory and is ruthlessly pursued by a secret police enforcer and the opposing troops. Meanwhile his commanding officer goes against orders in an attempt to rescue him.
From 2/14/1986 to 12/6/1991 is: 5 years, 9 months, 3 weeks, 1 day
59-3-1
http://www.imdb.com/title/tt0102975/
Star Trek VI: The Undiscovered Country (1991)
Release Date: 6 December 1991 (USA)
The space shuttle flight STS-26 returned to Earth 3.586 years after my 26th birthday. The following day was 3.589 years after my 26th birthday. If the shuttle flight STS-26 had landed 2 days later, it would have been 3.59 years after my 26th birthday. The time period from my 26th birthday to when STS-26 landed is 1310 days. That landing was only 2 days off from creating a perfect 3-59 clue pointing to me. I was 26 years old on 2/14/1986, the day I recognize as when I was shot down by anti-aircraft fire and was a POW in Libya.
From 3/3/1985 (26th) to 10/3/1988 is: 3 years, 214 days, or 3.586 years
From 3/3/1985 (26th) to 10/5/1988 is: 3 years, 216 days, or 3.59 years
http://en.wikipedia.org/wiki/STS-26
Launch: September 29, 1988
Landing: October 3, 1988
STS-26 was a space shuttle mission by NASA using the Discovery. It was the 26th shuttle mission, and the seventh for Discovery. It was the "Return to Flight" mission, being the first mission after the Space Shuttle Challenger disaster. This was the first mission to use the original Space Transportation System numbering system since STS-9, and the first to have all crew members wearing pressure suits for launch and landing since STS-4.
Space Shuttle Discovery lifted off from Pad B, Launch Complex 39, Kennedy Space Center, at 11:37 a.m. EDT on September 29, 1988, 975 days after the Challenger disaster. Launch of America's return-to-flight mission was delayed for 1 hour and 38 minutes because of unseasonable and unusual light winds aloft, and to replace fuses in the cooling systems of two crew members' flight suits. The suits were repaired, and a waiver was issued for the wind conditions after officials determined there was a sufficient safety margin for wind loads on the orbiter wing leading edges. The 26th Shuttle flight was the seventh for Discovery.
The primary payload for the STS-26 mission, a Tracking and Data Relay Satellite (TDRS), was successfully deployed, and 11 scheduled middeck scientific and technological experiments were carried out. The orbiter sustained only minor Thermal Protection System tile damage and the redesigned solid rocket boosters showed no signs of leakage or overheating at any of the joints.
Two minor problems occurred during the flight. After ascent, the Flash Evaporator System for cooling the orbiter iced up and shut down, increasing the crew cabin temperature to approximately 87 degrees Fahrenheit. The problem was resolved on Flight Day 4 and cooler temperatures resulted. A Ku-band antenna for communications was successfully deployed on Flight Day 2, but it failed to respond properly and had to be stowed for the remainder of the mission.
Besides conducting the various experiments, crew members practiced suiting up in new partial-pressure, or launch-and-entry, flight suits, and unstowing and attaching the new crew escape system. On Oct. 2, the day before the mission ended, the five-man crew paid a moving tribute to the 51-L Challenger crew.
Discovery landed on Runway 17, Edwards AFB, CA, at 12:37 p.m. EDT on Oct. 3. Mission duration was 4 days and 1 hour. Capsule Communicator Blaine Hammond Jr. welcomed the crew, saying it was "a great ending to a new beginning."
The space shuttle flight STS-27 launched 33.59 months after 2/14/1986. I recognize the date 2/14/1986 as when I was shot down by anti-aircraft fire somewhere in Africa. I would have turned 27 years old while a Prisoner of War of Libya.
From 2/14/1986 to 12/2/1988 is: 33 months, 18 days
30 * 0.59 = 17.7 days
From 2/14/1986 to 12/2/1988 is: 33.59 months
33-59
http://en.wikipedia.org/wiki/STS-27
Launch: December 2, 1988
Landing: December 6, 1988
STS-27 was a space shuttle mission by NASA using the Space Shuttle Atlantis. It was the 27th shuttle mission, and the 3rd for Atlantis, 2nd after the Challenger disaster. It carried a payload for the U.S. Department of Defense.
The Space Shuttle Atlantis (OV-104), at the time the youngest in NASA's fleet, made its third flight in a classified mission for the Department of Defense (DoD).
I recognize the date 2/14/1986 as when I was shot down by anti-aircraft fire somewhere in Africa. I was 28 when I returned on 5/13/1987.
From 2/14/1986 to 8/13/1989 is: 3 years, 5 months, 30 days
30 / 31 = 0.9
From 2/14/1986 to 8/13/1989 is: 3 years, 5.9 months
3-59
http://en.wikipedia.org/wiki/STS-28
STS-28
Launch: August 8, 1989
Landing: August 13, 1989
Fourth mission dedicated to United States Department of Defense, and first flight of Columbia since mission STS-61-C. Due to the nature of this mission, details are classified. Believed to have deployed two satellites, possibly including one second-generation Satellite Data System relay.
It has been reported that STS-28 also deployed an Advanced KH-11 photo-reconnaissance satellite that used an all-digital imaging system to return pictures. The satellite was placed into a low earth orbit with a high-inclination to the equator to allow coverage of most of the Earth's surface. The KH-11 series is a digital imaging photo- reconnaissance satellite with both visual and infrared sensors.
The pioneering Space Shuttle Orbiter Columbia (OV-102), the first operational reusable spaceship in NASA's fleet, lifted off from Pad 39B, Launch Complex 39, KSC, on 8 August 1989. Liftoff time was 8:37 a.m. EDT. It was the 30th flight of the Space Shuttle, and the first flight of the refurbished Columbia since the 61-C mission on 12 January 1986. Landing was at Edwards AFB, CA, at 9:37 p.m. EDT. The mission lasted for 5 days and 1 hour.
During the flight, the crew shut down a thruster in the reaction control system (RCS) because of indications of a leak. Also, an RCS heater malfunctioned.
Post-flight analysis of STS-28 discovered unusual heating of the thermal protection system (TPS) during re-entry. A detailed report ([1] identified protruding gap filler as the likely cause. This filler material is the same material which was removed during a spacewalk on the STS-114 Return to Flight mission in 2005.
The USS New Jersey BB-62 was re-commissioned on 12/28/1982, according to the following information I found on the internet. That was 3 days, 34 weeks, after 5/1/1982. I would expect that date to align with 4/30/1982, because that is the date I recognize as when I graduated from the U.S. Naval Academy. There might be a reason I don't remember yet. But I don't think it is a coincidence that the New Jersey was the first of those battleships to be brought into active duty and because I recognize that I got my first college degree from Princeton University in New Jersey. It makes sense that this ship was re-commissioned to time with my graduation from another college.
From 5/1/1982 to 12/28/1982 is: 3 days, 34 weeks
3-3-4
http://www.navysite.de/bb/bb62.htm
USS New Jersey (BB 62)
Fourth [and final] commissioning: December 28, 1982
From 6/7/1981 to 4/28/1984 is: 3 weeks, 34 months
3-3-4
http://www.navysite.de/bb/bb61.htm
USS Iowa (BB 61)
USS IOWA was the first ship in the United States’ last class of Battleships.
Third [and final] commissioning: April 28, 1984
From 6/7/1981 to 5/10/1986 is: 59 months, 3 days
59-3
http://www.navysite.de/bb/bb63.htm
USS Missouri (BB 63)
Second [and final] commissioning: May 10, 1986
USS MISSOURI was the third ship in the IOWA class and the last battleship commissioned by the United States Navy.
From 5/13/1987 to 10/22/1988 is: 1 year, 5 months, 9 days
1-59
http://www.navysite.de/bb/bb64.htm
USS Wisconsin (BB 64)
WISCONSIN was the fourth IOWA class battleship and the second ship in the Navy to bear the name of the state.
Third [and final] commissioning: October 22, 1988